APD

New inspection

Pick the Tech Spec section you're inspecting. 80 sections in the catalogue.

53 verbatim6 Tech Spec extract21 awaiting content
For team review: the catalogue covers every leaf section of the Fire PPM Tech Spec v1.1. Sections marked Verbatim are confirmed from the supplier spreadsheets. Sections marked Tech Spec extractwere auto-extracted from the PDF and need APD content review for OCR artefacts. Sections marked Awaiting contenthave a header and preamble only — the 6/12-monthly activities still need to be added.

4.1 — Control & Indicating Equipment (FCPs)· 4 sections

4.2 — Auxiliary Systems· 16 sections

4.3 — Damper/Door Control Panels· 5 sections

4.4 — Field Equipment· 7 sections

5.1 — Sprinklers, Mist & Gaseous Suppression· 11 sections

5.2 — Fire Water Supplies· 1 sections

5.3 — Hose Reels· 1 sections

5.4 — Fire Hydrants and Fire Main Systems· 16 sections

5.4.1.1 HAG
Hydrants above Ground
Tech Spec section 5.4.1.1 · 10 activities
Verbatim
5.4.1.2 HUP
Hydrants in Underground Pits
Tech Spec section 5.4.1.2 · 13 activities
Verbatim
5.4.1.3 EMF
External Mains Fed Hydrants
Tech Spec section 5.4.1.3 · 12 activities
Verbatim
5.4.1.4 HP
Hydrant Pumps
Tech Spec section 5.4.1.4 · 30 activities
Verbatim
5.4.1.5 STP
Suction Tank - Pump Fed Hydrants
Tech Spec section 5.4.1.5 · 13 activities
Verbatim
5.4.2.1 THJ
Tunnel Hydrants (JLE/NLE)
Tech Spec section 5.4.2.1 · 19 activities
Verbatim
5.4.2.2 THH
Tunnel Hydrants (Heathrow Loop)
Tech Spec section 5.4.2.2 · 15 activities
Verbatim
5.4.2.3 THP
Tunnel Hydrants (PiccEx to T5)
Tech Spec section 5.4.2.3 · 18 activities
Verbatim
5.4.2.4 PRH
Pressure Regulating Hydrant Landing Valve (Not pre-reduced by an in-line PRV)
Tech Spec section 5.4.2.4 · 14 activities
Verbatim
5.4.2.5 LPR
In-Line Pressure Regulating Valve Sets
Tech Spec section 5.4.2.5 · 13 activities
Verbatim
5.4.3.1 DWF
Dry & Wet Falling Mains
Tech Spec section 5.4.3.1 · 15 activities
Verbatim
5.4.3.2 DWF
Dry & Wet Falling Mains (With Pressure Regulating Hydrant Landing Valves)
Tech Spec section 5.4.3.2 · 17 activities
Verbatim
5.4.3.3 DWF
Dry & Wet Falling Mains (Hybrid Cast/Steel with In-Line Pressure Regulating Valve)
Tech Spec section 5.4.3.3 · 17 activities
Verbatim
5.4.4.1 MFP
Mains Feed Pla tform Hydrants
Tech Spec section 5.4.4.1 · 3 activities
Awaiting content
5.4.4.2 PHD
Platform Hy drant Main Is olation Valve Test
Tech Spec section 5.4.4.2 · 24 activities
Tech Spec extract
5.4.4.4 PHF
Platform Hydrant Flow Test (All Station s)
Tech Spec section 5.4.4.4 · 6 activities
Tech Spec extract

6 — Compartmentation (Walls, Doors, Seals, Penetrations)· 14 sections

7 — Portable Extinguishers· 5 sections